Shielded Tube

Copper foil...

$19.00$20.00

Shield sleeve...

$5.00$6.00
As of April 9, the FLS-6-100 is out of stock, so the lead time will be approximately one month.

Post-insertion shield...

$10.00

Shield mesh...

$5.00

Aluminum jacketed...

$10.00

Post-insertion type...

$14.00$16.00

Shielded copper...

$29.00$39.00
As of 12/24, CD-3592-100 is out of stock and the lead time will be approximately one month.

Hook and...

$17.00$20.00

Open/close rail...

$25.00$26.00
BACK TO TOP